Document Details Page

Search TRRP online library of documents and data

ID: 2494

YT (Yurok Tribe). 2021. Revised 90 percent design report Trinity River rehabilitation site at Oregon Gulch (river mile 80.9 to 81.7). Report for the Trinity River Restoration Program (TRRP). Yurok Tribe, Klamath, California. Available: www.trrp.net/library/document?id=2494.

This report presents the final 90 percent design for the Oregon Gulch channel rehabilitation project (Project). The Project is one of the 47 rehabilitation sites originally identified for construction by the 2000 Environmental Impact Statement/Report (USFWS et al. 2000) within the restoration reach. The restoration reach of the Trinity River spans 40 miles from Lewiston Dam downstream to the North Fork Trinity River confluence. The Project will function in concert with restoration flow releases across all water year types to support the fundamental goals of the Trinity River Restoration Program.

First Posted: 2021-05-04 17:15:16

Post Updated: 2021-05-04 17:40:24