Let's Work Together

Capital Development offers an exciting opportunity to be part of an innovative effort to transform PHL into a premier global hub. By smartly sourcing and connecting large, small, and diverse businesses to real opportunities, we will achieve our goals, engage the business community and deliver a first-class experience for travelers.

Contracting opportunities will be updated regularly; the tables below are as of April 2024.

 

Professional Services Opportunities 

Quarter 3 - 2024

OPPORTUNITY DESCRIPTION MORE INFORMATION
On Call Security & Special Systems Engineering Services
Provide on-call consulting services related to the security and other special systems on an as-needed basis at Philadelphia International Airport and Northeast Philadelphia Airport.  

 

Public Works Opportunities 

Quarter 2 - 2024

OPPORTUNITY DESCRIPTION MORE INFORMATION
Terminal DE Baggage Claim Roof Top Unit(s) Replacement
Replacement of 21 units in DE Bag Claim RTUs. Also includes installation of Bipolar Ionization units and connect them to the building automation system and upgrades to electrical system as needed to all units.   
Mechanical Room 3BC & 4BC Rehabilitation
Includes replacement of air handlers inside the MR#3BC and MR#4BC including associated hot water and chiller water piping and pumps and upgrades to electrical system as needed to all units.  
Bridge & Terminal Roof Top Unit(s) Upgrades, Package 1 
Replacement of air-handling units across multiple terminals and pedestrian bridges. Includes installation of Bipolar Ionization units and upgrades to electrical system(s) as needed.   
Bridge & Terminal Roof Top Unit(s) Upgrades, Package 2 
Replacement of air-handling units across multiple terminals and pedestrian bridges. Includes installation of Bipolar Ionization units and upgrades to electrical system(s) as needed.  

 

Quarter 3 - 2024

OPPORTUNITY

DESCRIPTION MORE INFORMATION
PNE Administration Building Upgrades 
 
 
 
 

Improvements to the existing administrative building, including the installation of an ADA accessible entrance and restrooms, as well as a geothermal air conditioning system. 

 
Terminals B/C & D/E Electrical Panel Replacement 
 
 
 
 

Replacement of various electrical panels in Terminals B/C and D/E. 

 
Parking Garage C Renewal 
 
 
 
 

Garage C restoration includes structural repairs, waterproofing, expansion joint(s), sealant, concrete repairs, exterior envelope, and plumbing systems to include domestic water, heating, fire, sprinkler, and stormwater. 

 
D&E Checkpoint Curtainwall Replacement 
 
 
 
 

Façade renovations consisting of architectural, structural, civil, and electrical.  

 
Terminal F Heated Pavement 
 
 
 
 

Demolition of existing system and installation of hydraulic piping system including mechanical, electrical, and civil disciplines. 

 
Primary Substation Improvements 
 
 
 
 

Upgrades or improvements including replacements of Control Power Transformers (CPT), oil filled transformers, installation of fire suppression systems, replacement of capacitor banks, breakers, etc. 

 
Departures Road Landscaping Improvements 
 
 
 
 

Landscaping improvements at Departures Road, South Commercial Road, Pedestrian Bridges, and Baggage Claim areas.  

 
CCTV Phase 2B 
 
 
 
 

Installation of an upgraded Video Surveillance System (VSS) within various areas at PHL.  

 
Grading Tract 14 
 
 
 
 

Grading of Tract 14 to include grading, storm drainage, and erosion control. 

 
Relocate TBA Substation 
 
 
 
 

Relocation of the TBA Substation to include electrical, mechanical, civil, structural, geotechnical, and architecture.  

 
Terminal D&E Secure Exit Lanes 
 
 
 
 

Enhancements such as physical dimension changes, system improvements/replacements, etc. to the existing unmanned gates, including new exit doors with new technologies, improving security while reducing on-going maintenance efforts. 

 
D&E Checkpoint Curtainwall Replacement 
 
 
 
 

Façade renovations consisting of architectural, structural, civil, and electrical.  

 

 

Quarter 4 - 2024

OPPORTUNITY
DESCRIPTION
Multi-User Flight Information Display System (MUFIDS) 
 
 
 
 

Provide implementation services for MUFIDS at Philadelphia International Airport in accordance with design specifications. 

Terminal E Holdroom Improvements 
 
 
 
 

Passenger facing upgrades to include new flooring finishes, new ceilings, lighting, wall base, column covers, and electrical upgrades. 

Unit Substation Improvements 
 
 
 
 

Improvements to eight substations units including main breakers, oil filled switches, personnel doors, ground wires, safety improvements, replacement of security features, etc. 

Terminals A-F Refresh 
 
 
 
 

Scope includes new ceilings, lighting, wall and column finishes, and new floor finishing. 

Pavement & Grounds Building C 
 
 
 
 

All trades construction to include an enclosed 8-bay storage shed with overhead doors for large vehicles. 

Terminal LED Upgrades Phase 4 
 
 
 
 

Continuation of lighting retro- fit in Concourse A West, Terminal & Concourse A East, A East Hold Rooms, public areas, & AB Connector.  

1918 Sanitary System Upgrades 
 
 
 
 

Refurbishment of sanitary lift station(s), including replacement/ concrete encased terracotta mains. 

 

Northeast Airfield Development-Site Demolition 
 
 
 
 

This project consists of demolition and site preparation for future facilities and site grading requirements. 

Terminals BC Baggage Claim Roof Replacement 
 
 
 
 

Replacement of 100,000 square feet of roofing with 2-ply bituminous roofing. 

 