Phase 1 was completed in fall 2023 with the installation of tall curbs at strategic locations along the corridor. Your input will help inform Phase 2 improvements in 2024.

Project Overview

The Baseline Road Transportation Safety Project will improve multimodal travel safety along Baseline Road from 30th Street to Foothills Parkway.

This section of Baseline Road is one of the most-traveled corridors in the city and is home to many key community destinations and services, including apartments, grocery shops, affordable housing, health centers, shops and student housing for the University of Colorado Boulder. However, it is also a location with a high number of serious-injury crashes compared to other streets in the city.

This project will enhance safety and connectivity on Baseline Road through a number of improvements including intersection and multimodal facility enhancements.


View the most current information on the project webpage or subscribe to the monthly Transportation & Mobility newsletter for project updates.


Provide Your Input

Beginning on April 29 to May 27, take the questionnaire and drop pins on the interactive map to tell us what you think about the changes made so far to Baseline Road in Phase 1 and what you want to see in Phase 2.

Phase 1 was completed in fall 2023 with the installation of tall curbs at strategic locations along the corridor. Your input will help inform Phase 2 improvements in 2024.

Project Overview

The Baseline Road Transportation Safety Project will improve multimodal travel safety along Baseline Road from 30th Street to Foothills Parkway.

This section of Baseline Road is one of the most-traveled corridors in the city and is home to many key community destinations and services, including apartments, grocery shops, affordable housing, health centers, shops and student housing for the University of Colorado Boulder. However, it is also a location with a high number of serious-injury crashes compared to other streets in the city.

This project will enhance safety and connectivity on Baseline Road through a number of improvements including intersection and multimodal facility enhancements.


  • CLOSED: This survey has concluded.

    Phase 1 of the Baseline Road Transportation Safety Project is complete. Let us know what you think about the changes and help inform what we do for Phase 2 of the project starting in 2024. 

    Take questionnaire
    Share on Facebook Share on Twitter Share on Linkedin Email this link
  • CLOSED: This survey has concluded. Find more info: https://bouldercolorado.gov/baseline-project

    As part of the Baseline Road Transportation Safety Project, the city is looking for feedback from community members to help us understand specific transportation safety concerns along this corridor. Please fill out our short questionnaire below to let us know about issues you may experience walking, biking, taking transit or driving along this section of Baseline. The questionnaire refers to conditions on Baseline Road between 30th Street and Foothills Parkway (see map below). 

    The questionnaire closed Sept. 30, 2022. Thank you for your feedback!

    Click here to expand the map below in a new window

    Complete Form
    Share on Facebook Share on Twitter Share on Linkedin Email this link
Page last updated: 12 Apr 2024, 12:03 PM