The following navigation utilizes arrow, enter, escape, and space bar key commands. Left and right arrows move through main tier links and expand / close menus in sub tiers. Up and Down arrows will open main tier menus and toggle through sub tier links. Enter and space open menus and escape closes them as well. Tab will move on to the next part of the site rather than go through menu items.
We get there together.
As CTA’s largest transit investment, the Red and Purple Modernization (RPM) Phase One Project modernizes our public transportation system to strengthen communities, serve riders and stimulate inclusive economic growth.
Learn more about RPM
The alley east of 5843-5921 N Broadway will close during work hours 7am-7pm weekdays and Saturdays thru May 22 for embankment wall repairs. Download Document
Parking lane and sidewalk closure during work hours 7am-5pm for track structure concrete placement. Download Document
One sidewalk on W Lawrence will close thru May 10 for sidewalk bump-out construction. Download Document
The alleys will be closed thru May 11 with work hours 7am-7pm weekdays and Saturdays for alley restoration. Download Document
The alley behind 6237 N Broadway will close during work hours 7am-7pm weekdays and Saturdays thru May 6 for signal house removal. Download Document
Crews will periodically block the alley adjacent to the CTA Tracks when mobilizing equipment and materials; general construction noise during work hours 7am-7pm weekdays and Saturdays thru June 15 for track structure rehabilitation. Download Document
Parking lane and sidewalk closures during work hours 7am-5pm on April 26 for track structure concrete placement. Download Document
W Hollywood at the CTA tracks will close nightly from 9pm-5am thru May 3 for track structure segment installation. Download Document
The entrance to the alley at W Lawrence will close during work hours 7am-7pm thru May 3 for station foundation preparation. Download Document
Get just the updates important to you by selecting your zone and nearest station.
Sign up for project emails
Support local businesses in Andersonville, Edgewater, Lakeview East and Uptown by shopping, eating and exploring new neighborhoods.
Support local businesses
Apply to be a featured business
Creating a better Chicago for everyone.
Learn more about workforce and business opportunities
As RPM Phase One continues construction, CTA is moving ahead on the multi-year process to initiate the next phase of the RPM program. The RPM Next Phases Planning Study is the first step of the planning process that will set goals and objectives, engage the public, identify potential projects, and evaluate alternatives and phasing.