EXTENDED ALLEY CLOSURE
Dates: Saturday, March 5 to Saturday, March 19, 2022
Dates are subject to change due to weather and construction schedule adjustments.
Location: The alley behind 5500 - 5558 N. Winthrop Avenue
(W. Catalpa Avenue to W. Bryn Mawr Avenue)
Work Hours: 7am to 7pm weekdays and Saturdays; continuous 24/7 alley closure
Work Activity: Drilled Shaft Installation
Local Impact:
- The alley will be closed at all times.
- Vehicles will be unable to enter/exit garages and parking spaces in the alley between W. Catalpa Avenue and W. Bryn Mawr Avenue during this closure.
- The contractor will provide alternative parking for impacted residents.
- If you need further information about alternative parking, please contact the contractor, Walsh-Fluor, at 708-253-9772.
- The contractor will maintain garbage and recycling pickup.
- There will be noise while work is being performed. Noise will include:
- General construction noise
- Noise and vibration from drilling and hauling material
- Beeping from backup alarms on maintenance equipment and vehicles
- Flagging horns
|