Westwood Bl between Ashton Av and Lindbrook Dr: Instrumentation Installation
Contractors will continue installing instruments to support Westwood/UCLA Station construction. Instruments will be installed on Westwood Bl between Ashton Av and Lindbrook Dr in different stages.
When:
Ongoing through Summer 2023
Work hours:
Monday to Friday, 9pm to 6am
Traffic Control:
Stage 1
Stage 2
Stage 3
-
The westbound Wilshire Bl left turn pockets will be closed at Westwood Bl. -
Two eastbound Wilshire Bl lanes will be closed between Gayley Av and Westwood Bl -
The northbound Westwood Bl left turn pocket will be closed at Wilshire Bl.
Stage 4
Stage 5
-
Three southbound Westwood Bl lanes will be restricted between Lindbrook Dr and Wilshire Bl. -
Westbound Wilshire Bl lanes between Glendon Av to about 200’ ft west of Westwood Bl will be closed. -
The west leg crosswalk will be closed at the intersection of Wilshire Bl and Westwood Bl.
Noteworthy:
-
All work will receive the necessary permits and approvals. -
Access to driveways, residences & businesses will always be maintained unless notified in advance. -
Access for pedestrians will be maintained outside of construction zones. -
Access for the Fire Department and emergency responders will be maintained.
-
Parking restrictions will be implemented in the immediate area of the work zone. -
Construction is dynamic and schedules are subject to change. -
24/7 Hotline: 213-922-6934
Metro Access
Metro bus stops may be relocated, or lines could be impacted. For information changes to Metro service, please call 323.GoMetro. Passengers are encouraged to use the Transit App to plan their travels. |