Upper Swanston Ranch, Inc. Irrigation and Fish Passage Improvement Project

4 Documents in Project

Summary

SCH Number
2023090717
Lead Agency
California Department of Water Resources (DWR)
Document Title
Upper Swanston Ranch, Inc. Irrigation and Fish Passage Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
12/1/2023
Document Description
The project consists of modifying an existing irrigation channel adjacent to Tule Canal to avoid fish entrainment, installing a new fish-friendly water intake structure with fish protective screens within Tule Canal, and installing a new pump site west of Tule Canal that would pull water from the proposed water intake screens through buried irrigation pipes beneath an agricultural pasture to an improved holding reservoir to the west. The water held in the reservoir would be available for diversion north from the reservoir for use within irrigated fields.

Contact Information

Name
Joshua Martinez
Agency Name
Department of Water Resources
Job Title
Environmental Program Manager I
Contact Types
Lead/Public Agency

Location

Cities
West Sacramento
Counties
Yolo
Regions
Northern California
Cross Streets
Tule Jake Road
Zip
95814
Total Acres
2
Parcel #
042-270-015, 042-260-003, 042-260-024
State Highways
80
Railways
Union Pacific
Airports
N/A
Schools
Sacramento Valley Charter
Waterways
Sacramento River
Township
9N
Range
3E
Section
35
Base
MDBM

Notice of Determination

Approving Agency
California Department of Water Resources
Approving Agency Role
Lead Agency
Approved On
County Clerk
Yolo
Final Environmental Document Available at
3500 Industrial Blvd. West Sacramento, CA 95691

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print