EMERGENCY INFORMATION FDOT Emergency Travel Alert: For information on the current situation, please visit the following page - Alerts.

Project Details
Work Type: Resurfacing
Phase: Construction
Length: 4.551 miles
City:
County:
Road:
Construction Cost: $15.3 Million
Project Start: Spring 2024
Est. Completion: Summer 2025
About

The purpose of the project is to resurface State Road (S.R.) 100 from east of N. Palmetto Road in Bunnell to east of Old Kings Road in Palm Coast to extend the service life of the existing roadway. Improvements include constructing 6-foot-wide sidewalk to close sidewalk gaps where existing right of way allows and improving pedestrian features at intersections within the project limits. The project also plans to upgrade traffic signals at two existing intersections with new signal poles and install Wrong Way Driving devices at the I-95 interchange off-ramps.

Contact Information
Communications Team
Britney Jones
(386) 740-3566
Britney.Jones@dot.state.fl.us
Contractor
Halifax Paving, Inc.
Lane Closures
  • Starting Sunday, April 21, through Thursday, April 25, from 9 p.m. to 7 a.m. nightly, the contractor will begin operations by paving the eastbound outside lane of S.R. 100 starting from just west of Bulldog Drive/Aviation Drive to east of Old Kings Road. After this segment is completed, the contractor will pave the westbound outside lane of S.R. 100 starting from east of Old Kings Road to just west of Bulldog Drive/Aviation Drive. Once the contractor is finished paving the outside travel lanes, they will begin paving the inside lanes.

Project Files